methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
A paper-based illustration representing WSJF with its core stages and visible working result.
Agile
WSJF
Paper illustration for Kepner-Tregoe
Operations
Kepner-Tregoe
Purposedifferent
When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.When many tasks compete for the same capacity, it orders work by economic impact. It makes time lost, benefit, and effort comparable together.For a disturbance that's hard to pin down, the method cleanly separates problem, cause, and decision. It reduces mixing when symptoms allow several interpretations.
Complexitydifferent
LowLowHighHigh
Timedifferent
30-60 min15-30 min45-90 min2-8 h
Participantsdifferent
3-102-63-102-8
Formatdifferent
Workshop + asyncWorkshopWorkshopWorkshop + async
Outputdifferent
Risk Matrix, Top Risk ListRoot cause notes, CountermeasuresRanked Backlog, Cost-of-Delay AssumptionsProblem Analysis, Decision Analysis, Risk Plan
Tagsno overlap
RiskDecisionPrioritizationAssessment
Root causeIncidentLeanProblem solving
LeanEconomicsSequencePrioritization
Problem solvingRoot causeDecisionOperations
Add more methods