methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
A paper-based illustration representing WSJF with its core stages and visible working result.
Agile
WSJF
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Purposedifferent
When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.When many tasks compete for the same capacity, it orders work by economic impact. It makes time lost, benefit, and effort comparable together.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.
Complexitydifferent
LowLowHighHigh
Timedifferent
30-60 min15-30 min45-90 min90-180 min
Participantsdifferent
3-102-63-103-8
Formatdifferent
Workshop + asyncWorkshopWorkshopWorkshop
Outputdifferent
Risk Matrix, Top Risk ListRoot cause notes, CountermeasuresRanked Backlog, Cost-of-Delay AssumptionsCoD Table, Prioritization Sequence
Tagsno overlap
RiskDecisionPrioritizationAssessment
Root causeIncidentLeanProblem solving
LeanEconomicsSequencePrioritization
PrioritizationDeliveryEconomicsDecision
Add more methods