methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
Paper illustration for 8D Problem Solving.
Operations
8D Problem Solving
Paper illustration for Kepner-Tregoe
Operations
Kepner-Tregoe
Purposedifferent
When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.For an acute quality or delivery problem, the method structures immediate protection and root cause work together. It keeps the situation stable while the actual cause is investigated cleanly.For a disturbance that's hard to pin down, the method cleanly separates problem, cause, and decision. It reduces mixing when symptoms allow several interpretations.
Complexitydifferent
LowLowHighHigh
Timedifferent
30-60 min15-30 min1-6 Wochen2-8 h
Participantsdifferent
3-102-64-102-8
Formatdifferent
Workshop + asyncWorkshopWorkshop + asyncWorkshop + async
Outputdifferent
Risk Matrix, Top Risk ListRoot cause notes, Countermeasures8D Report, Containment Plan, Root Cause Evidence, Corrective Action PlanProblem Analysis, Decision Analysis, Risk Plan
Tagsno overlap
RiskDecisionPrioritizationAssessment
Root causeIncidentLeanProblem solving
QualityProblem solvingRoot cause
Problem solvingRoot causeDecisionOperations
Add more methods