methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Rich Picture workspace showing the question, observations, and next decision.
Systems Thinking
Rich Picture
Paper fishbone diagram with a measurable effect at the head and six labeled cause branches.
Operations
Fishbone Diagram
A3 Problem-Solving workspace showing the question, observations, and next decision.
Operations
A3 Problem Solving
Paper illustration for Failure Mode and Effects Analysis
Operations
Failure Mode and Effects Analysis
Purposedifferent
A Rich Picture brings an unclear situation onto a shared drawing. It captures actors, tensions, information flows, and blind spots before the team jumps to solutions too early.When a problem has several possible contributing factors, the method sorts causes by cause areas. It prevents an initial hunch from blocking the view of other plausible drivers.For a complex deviation with several people involved, the method bundles problem, analysis, and decision onto one page. It creates a shared working space where causes, countermeasures, and follow-up fit together.For a process, product, or service with noticeable failure risks, the method assesses possible failure modes in advance. It directs attention to combinations of occurrence, effect, and detectability.
Complexitydifferent
LowLowMediumHigh
Timedifferent
30-90 min30-60 min45-90 min2-6 h
Participantsdifferent
2-102-82-53-10
Formatdifferent
WorkshopWorkshopWorkshop + asyncWorkshop
Outputdifferent
Rich Picture, Problem Framing NotesFishbone Diagram, Cause Categories, Investigation BacklogA3 Report, Action Plan, Root Cause AnalysisFMEA Table, Risk Priority, Mitigation Actions
Tagsno overlap
Systems thinkingSoft systemsFramingVisualization
Root causeQualityOperations
LeanProblem solvingCoachingOperations
RiskQualityOperationsRoot cause
Add more methods