View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Systems Thinking Rich Picture | ![]() Decision Making Decision Tree | ![]() Engineering Failure Scenario Analysis | ![]() Decision Making Pre-Mortem |
|---|---|---|---|---|
Purposedifferent | A Rich Picture brings an unclear situation onto a shared drawing. It captures actors, tensions, information flows, and blind spots before the team jumps to solutions too early. | For decisions with follow-on paths and dependencies, a linear comparison is often not enough. A Decision Tree shows how options branch under conditions and which consequences hang on each branch. | In critical processes, it is not enough to plan only for the normal case. Failure Scenario Analysis looks at the path into failure and shows which failures, chains, and control gaps cause the most damage. | In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures. |
Complexitydifferent | Low | Medium | Medium | Low |
Timedifferent | 30-90 min | 30-90 min | 1-3 h | 20–45 min |
Participantsdifferent | 2-10 | 1-6 | 3-8 | Small cross-functional group |
Formatdifferent | Workshop | Workshop + async | Workshop | Workshop |
Outputdifferent | Rich Picture, Problem Framing Notes | Decision Tree, Option Map, Assumption List | Failure Scenarios, Risk Notes, Control Gaps, Test and Response Actions | Risk list, Mitigation plan, Assumption log |
Tagsno overlap | Systems thinkingSoft systemsFramingVisualization | DecisionTreeOptions | FailureResilienceRisk | RiskDecisionFailurePlanning |



