methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of Request for Comments (RFC) with its method-specific working model.
Architecture
Request for Comments
Paper illustration for Risk Storming.
Architecture
Risk Storming
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
Paper illustration of a calm four-quadrant Assumption Map with hypothesis cards and emphasis on important assumptions with little evidence.
Product Discovery
Assumption Mapping
Purposedifferent
An RFC clarifies architecture context, options, and consequences. It structures technical context, alternatives, tradeoffs, open questions, and review feedback, and captures the result as an RFC document, reviewer comments, and a decision rationale.Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first.
Complexitydifferent
MediumLowLowMedium
Timedifferent
1-3 Wochen vom Draft bis zur Entscheidung60-90 min30-60 min45-60 min
Participantsdifferent
3-20 Reviewer4-123-102-8
Formatdifferent
AsyncWorkshopWorkshop + asyncWorkshop + async
Outputdifferent
RFC document, Reviewer comments, Decision rationale, Follow-up ADR or ticketsAnnotated Diagram, Prioritized Risk List, Action BacklogRisk Matrix, Top Risk ListAssumption map, Test backlog, Risk ranking
Tagsno overlap
ArchitectureDecisionAsyncGovernance
RiskArchitectureWorkshopValidation
RiskDecisionPrioritizationAssessment
AssumptionsRiskExperimentsValidation
Add more methods