methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of Request for Comments (RFC) with its method-specific working model.
Architecture
Request for Comments
Paper illustration for Communication Plan
Delivery
Communication Plan
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Purposedifferent
An RFC clarifies architecture context, options, and consequences. It structures technical context, alternatives, tradeoffs, open questions, and review feedback, and captures the result as an RFC document, reviewer comments, and a decision rationale.When many people need to be informed in parallel and messages would otherwise arrive unevenly or too late, a Communication Plan orders communication reliably. Channels, audiences, and cadences interlock so important information doesn't get lost.ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.
Complexitydifferent
MediumLowHighLow
Timedifferent
1-3 Wochen vom Draft bis zur Entscheidung45-90 minSeveral meetings plus preparation and analysis; total effort depends on scope20–45 min
Participantsdifferent
3-20 Reviewer2-6Evaluation team, architects, and relevant stakeholdersSmall cross-functional group
Formatdifferent
AsyncWorkshop + asyncWorkshop + asyncWorkshop
Outputdifferent
RFC document, Reviewer comments, Decision rationale, Follow-up ADR or ticketsCommunication Plan, Channel Matrix, Message CadencePrioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigationsRisk list, Mitigation plan, Assumption log
Tagsno overlap
ArchitectureDecisionAsyncGovernance
CommunicationStakeholdersDeliveryPlanning
ArchitectureQualityRiskTradeoffsStakeholders
RiskDecisionFailurePlanning
Add more methods