methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of RAID Log with a method-specific labelled workspace.
Delivery
RAID Log
Paper illustration for Dot Estimation.
Facilitation
Dot Estimation
Paper illustration for Three-Point Estimation.
Decision Making
Three-Point Estimation
Paper illustration for NoEstimates.
Agile
NoEstimates
Purposedifferent
Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting.When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets.A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes.When estimating slows a team down more than it helps, it shifts the focus to flow, small slices, and real lead time. It sorts work by value, risk, and delivery ability. The result is captured as Throughput Data, Flow Forecast, and Slicing Rules.
Complexitydifferent
LowLowMediumMedium
Timedifferent
30 min Setup, dann laufend5-20 min10-30 min je Itemlaufend
Participantsdifferent
1-3 maintaining, briefing for everyone3-201-82-12
Formatdifferent
AsyncWorkshopWorkshop + asyncWorkshop + async
Outputdifferent
RAID Log, Status Report SourceEffort Heatmap, Risk Signals, Discussion TargetsThree-Point Estimate, Risk Range, Assumption NotesThroughput Data, Flow Forecast, Slicing Rules
Tagsno overlap
RiskTrackingStakeholdersGovernance
EstimationEffortRisk
EstimationUncertaintyForecasting
EstimationForecastingFlow
Add more methods