methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Views and Beyond method illustration showing its working structure
Architecture
Views and Beyond
Software Architecture Canvas method illustration showing its working structure
Architecture
Software Architecture Canvas
Paper illustration for Risk Storming.
Architecture
Risk Storming
Purposedifferent
In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.Views and Beyond organizes architecture into several views so no single diagram has to do everything at once. This makes it possible to choose the representation that fits the stakeholder's question.The Software Architecture Canvas reduces a system to the most important architecture decisions, constraints, and interfaces. It is useful when teams need a resilient overall picture quickly.Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.
Complexitydifferent
LowMediumLowLow
Timedifferent
20–45 min1-3 Tage1-2 h60-90 min
Participantsdifferent
Small cross-functional group1-43-104-12
Formatdifferent
WorkshopWorkshop + asyncWorkshopWorkshop
Outputdifferent
Risk list, Mitigation plan, Assumption logArchitecture Views, Cross-view Notes, RationaleArchitecture Canvas, Goals, Constraints, Quality AttributesAnnotated Diagram, Prioritized Risk List, Action Backlog
Tagsno overlap
RiskDecisionFailurePlanning
DocumentationStakeholdersArchitecture
CanvasArchitectureAlignmentWorkshop
RiskArchitectureWorkshopValidation
Add more methods