View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Pre-Mortem | ![]() Engineering Failure Scenario Analysis | ![]() Growth Hooked Model | ![]() Decision Making Assumption Surfacing |
|---|---|---|---|---|
Purposedifferent | In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures. | In critical processes, it is not enough to plan only for the normal case. Failure Scenario Analysis looks at the path into failure and shows which failures, chains, and control gaps cause the most damage. | The Hooked Model helps clarify engagement loops, user behavior, and experiments. It makes repeat behavior measurable and captures the result as a hooked loop, trigger map, and reward design. | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. |
Complexitydifferent | Low | Medium | Medium | Low |
Timedifferent | 20–45 min | 1-3 h | Multiple workshops over several weeks | 45-90 min |
Participantsdifferent | Small cross-functional group | 3-8 | 2-8 | 2-8 |
Formatdifferent | Workshop | Workshop | Workshop + async | Workshop + async |
Outputdifferent | Risk list, Mitigation plan, Assumption log | Failure Scenarios, Risk Notes, Control Gaps, Test and Response Actions | Hooked loop, Trigger map, Reward design, Ethics check | Assumption List, Critical Assumptions, Learning Plan |
Tagsno overlap | RiskDecisionFailurePlanning | FailureResilienceRisk | GrowthBehaviorRetention | AssumptionsRiskDecisionDiscovery |



