View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Decision Making Pre-Mortem | ![]() Engineering Failure Scenario Analysis | ![]() Growth A/B Testing | ![]() Decision Making Assumption Surfacing |
|---|---|---|---|---|
Purposedifferent | In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures. | In critical processes, it is not enough to plan only for the normal case. Failure Scenario Analysis looks at the path into failure and shows which failures, chains, and control gaps cause the most damage. | When two variants compete, discussions quickly decide by taste rather than effect. A/B Testing checks behavior under controlled conditions and separates real improvement from chance or expectation effects. | Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it. |
Complexitydifferent | Low | Medium | High | Low |
Timedifferent | 20–45 min | 1-3 h | 1-4 Wochen | 45-90 min |
Participantsdifferent | Small cross-functional group | 3-8 | 1-6 | 2-8 |
Formatdifferent | Workshop | Workshop | Async | Workshop + async |
Outputdifferent | Risk list, Mitigation plan, Assumption log | Failure Scenarios, Risk Notes, Control Gaps, Test and Response Actions | Experiment results, Decision log, Learning summary | Assumption List, Critical Assumptions, Learning Plan |
Tagsno overlap | RiskDecisionFailurePlanning | FailureResilienceRisk | ExperimentsGrowthAnalyticsValidation | AssumptionsRiskDecisionDiscovery |



