methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Paper illustration of Request for Comments (RFC) with its method-specific working model.
Architecture
Request for Comments
Paper illustration of RAID Log with a method-specific labelled workspace.
Delivery
RAID Log
Purposedifferent
In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.An RFC clarifies architecture context, options, and consequences. It structures technical context, alternatives, tradeoffs, open questions, and review feedback, and captures the result as an RFC document, reviewer comments, and a decision rationale.Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting.
Complexitydifferent
LowHighMediumLow
Timedifferent
20–45 minSeveral meetings plus preparation and analysis; total effort depends on scope1-3 Wochen vom Draft bis zur Entscheidung30 min Setup, dann laufend
Participantsdifferent
Small cross-functional groupEvaluation team, architects, and relevant stakeholders3-20 Reviewer1-3 maintaining, briefing for everyone
Formatdifferent
WorkshopWorkshop + asyncAsyncAsync
Outputdifferent
Risk list, Mitigation plan, Assumption logPrioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigationsRFC document, Reviewer comments, Decision rationale, Follow-up ADR or ticketsRAID Log, Status Report Source
Tagsno overlap
RiskDecisionFailurePlanning
ArchitectureQualityRiskTradeoffsStakeholders
ArchitectureDecisionAsyncGovernance
RiskTrackingStakeholdersGovernance
Add more methods