methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
A paper-based illustration representing arc42 with its core stages and visible working result.
Architecture
arc42
Paper illustration of a decision table with criteria rows, weighted ratings, and a narrowly leading alternative.
Decision Making
Decision Matrix
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Purposedifferent
In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.arc42 structures architecture knowledge so teams can document system, decisions, and risks consistently. The template builds a living understanding of the architecture instead of scattered notes.When several options collide with several criteria, comparison quickly becomes subjective. A Decision Matrix makes the trade-off visible and brings weighting, criteria, and options into a shared logic.ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.
Complexitydifferent
LowLowMediumHigh
Timedifferent
20–45 min1-2 Tage45-90 minSeveral meetings plus preparation and analysis; total effort depends on scope
Participantsdifferent
Small cross-functional group1-42-8Evaluation team, architects, and relevant stakeholders
Formatdifferent
WorkshopWorkshop + asyncWorkshop + asyncWorkshop + async
Outputdifferent
Risk list, Mitigation plan, Assumption logArchitecture Document, Context View, Runtime View, Deployment ViewDecision Matrix, Scoring Rationale, Selected OptionPrioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigations
Tagsno overlap
RiskDecisionFailurePlanning
ArchitectureDocumentationCommunication
DecisionCriteriaScoringTradeoffs
ArchitectureQualityRiskTradeoffsStakeholders
Add more methods