View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
Paper illustration for Constraint Analysis.
Decision Making
Constraint Analysis
Paper illustration for 8D Problem Solving.
Operations
8D Problem Solving
Purposedifferent
In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.When an initiative stalls, the limit often lies not in the idea but in hard or soft boundary conditions. Constraint Analysis separates these limits and shows which of them can actually be shaped.For an acute quality or delivery problem, the method structures immediate protection and root cause work together. It keeps the situation stable while the actual cause is investigated cleanly.
Complexitydifferent
LowLowLowHigh
Timedifferent
20–45 min15-30 min30-90 min1-6 Wochen
Participantsdifferent
Small cross-functional group2-62-84-10
Formatdifferent
WorkshopWorkshopWorkshop + asyncWorkshop + async
Outputdifferent
Risk list, Mitigation plan, Assumption logRoot cause notes, CountermeasuresConstraint List, Hard/Soft Classification, Option Impact Notes, Decision Boundaries8D Report, Containment Plan, Root Cause Evidence, Corrective Action Plan
Tagsno overlap
RiskDecisionFailurePlanning
Root causeIncidentLeanProblem solving
ConstraintsDecisionPlanningOptions
QualityProblem solvingRoot cause