View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of Power-Interest Grid with a method-specific labelled workspace.
Facilitation
Power Interest Grid
Paper illustration for Risk Storming.
Architecture
Risk Storming
Stakeholder Mapping
Facilitation
Stakeholder Mapping
Software Architecture Canvas method illustration showing its working structure
Architecture
Software Architecture Canvas
Purposedifferent
When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy.Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.When an initiative depends on many people, interests, and power dynamics, Stakeholder Mapping systematically orders the environment. It shows who influences, who is affected, and where relationship management or safeguarding matters first.The Software Architecture Canvas reduces a system to the most important architecture decisions, constraints, and interfaces. It is useful when teams need a resilient overall picture quickly.
Complexitysame
LowLowLowLow
Timedifferent
30-60 min60-90 min60–90 min1-2 h
Participantsdifferent
2-84-122-83-10
Formatdifferent
WorkshopWorkshopWorkshop + asyncWorkshop
Outputdifferent
Power Interest Grid, Strategy per StakeholderAnnotated Diagram, Prioritized Risk List, Action BacklogStakeholder Map, Engagement Plan, Risk NotesArchitecture Canvas, Goals, Constraints, Quality Attributes
Tagsno overlap
StakeholdersFacilitationAlignmentPlanning
RiskArchitectureWorkshopValidation
StakeholdersAlignmentFacilitationChange
CanvasArchitectureAlignmentWorkshop
Add more methods