Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for PERT Estimation.
Decision Making
PERT Estimation
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
Paper illustration for 8D Problem Solving.
Operations
8D Problem Solving
Purposedifferent
On complex initiatives, a plain average tends to understate just how uncertain the outcome really is. It separates options, evaluation criteria, and open risks. The result is captured as a PERT Estimate, Expected Value, and Risk Notes.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.For an acute quality or delivery problem, the method structures immediate protection and root cause work together. It keeps the situation stable while the actual cause is investigated cleanly.
Complexitydifferent
MediumMediumLowHigh
Timedifferent
15-45 minOngoing15-30 min1-6 Wochen
Participantsdifferent
1-82-122-64-10
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop + async
Outputdifferent
PERT Estimate, Expected Value, Risk NotesKanban board, WIP policies, Flow metricsRoot cause notes, Countermeasures8D Report, Containment Plan, Root Cause Evidence, Corrective Action Plan
Tagsno overlap
EstimationUncertaintyRisk
FlowVisual managementDelivery
Root causeIncidentLeanProblem solving
QualityProblem solvingRoot cause