methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for PDCA Cycle.
Operations
PDCA Cycle
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
A paper-based illustration representing WSJF with its core stages and visible working result.
Agile
WSJF
Paper illustration of an assumption matrix with prioritized test cards
Decision Making
Assumption Surfacing
Purposedifferent
For an improvement that still has to prove itself in everyday work, the method runs it through small learning loops. It connects planning, checking, and standardization into a repeatable learning mode.When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.When many tasks compete for the same capacity, it orders work by economic impact. It makes time lost, benefit, and effort comparable together.Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it.
Complexitydifferent
LowLowHighLow
Timedifferent
1 h bis mehrere Wochen30-60 min45-90 min45-90 min
Participantsdifferent
1-83-103-102-8
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop + async
Outputdifferent
PDCA Log, Experiment Plan, Learning Outcome, Standard ChangeRisk Matrix, Top Risk ListRanked Backlog, Cost-of-Delay AssumptionsAssumption List, Critical Assumptions, Learning Plan
Tagsno overlap
Continuous improvementLeanExperiments
RiskDecisionPrioritizationAssessment
LeanEconomicsSequencePrioritization
AssumptionsRiskDecisionDiscovery
Add more methods