methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for PDCA Cycle.
Operations
PDCA Cycle
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
A paper-based illustration representing WSJF with its core stages and visible working result.
Agile
WSJF
Purposedifferent
For an improvement that still has to prove itself in everyday work, the method runs it through small learning loops. It connects planning, checking, and standardization into a repeatable learning mode.When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.When many tasks compete for the same capacity, it orders work by economic impact. It makes time lost, benefit, and effort comparable together.
Complexitydifferent
LowLowHighHigh
Timedifferent
1 h bis mehrere Wochen30-60 min90-180 min45-90 min
Participantsdifferent
1-83-103-83-10
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop
Outputdifferent
PDCA Log, Experiment Plan, Learning Outcome, Standard ChangeRisk Matrix, Top Risk ListCoD Table, Prioritization SequenceRanked Backlog, Cost-of-Delay Assumptions
Tagsno overlap
Continuous improvementLeanExperiments
RiskDecisionPrioritizationAssessment
PrioritizationDeliveryEconomicsDecision
LeanEconomicsSequencePrioritization
Add more methods