View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for NoEstimates.
Agile
NoEstimates
Iceberg Model method illustration showing its working structure
Systems Thinking
Iceberg Model
Paper illustration for Bottleneck Analysis.
Operations
Bottleneck Analysis
Paper illustration for Current Reality Tree
Systems Thinking
Current Reality Tree
Purposedifferent
When estimating slows a team down more than it helps, it shifts the focus to flow, small slices, and real lead time. It sorts work by value, risk, and delivery ability. The result is captured as Throughput Data, Flow Forecast, and Slicing Rules.The Iceberg Model separates visible events from patterns, structures, and mental models. This turns a single observation into a deeper understanding of why a problem keeps recurring.For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput.A Current Reality Tree condenses many symptoms into a few causal chains. The method makes visible which core problems drive several negative effects at once.
Complexitydifferent
MediumLowMediumHigh
Timedifferent
laufend30-60 min1-3 h2-6 h
Participantsdifferent
2-122-103-83-8
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshop + asyncWorkshop
Outputdifferent
Throughput Data, Flow Forecast, Slicing RulesIceberg Worksheet, Pattern Notes, Intervention IdeasBottleneck Map, Flow Metrics, Improvement Options, Follow-up MeasuresCurrent Reality Tree, Core Problems, Intervention Ideas
Tagsno overlap
EstimationForecastingFlow
Systems thinkingRoot causePatterns
FlowMeasurementConstraints
Systems thinkingRoot causeConstraintsCausality