methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for NoEstimates.
Agile
NoEstimates
Paper illustration of HEART Framework with its method-specific working model.
UX Research
HEART Framework
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration for Bottleneck Analysis.
Operations
Bottleneck Analysis
Purposedifferent
When estimating slows a team down more than it helps, it shifts the focus to flow, small slices, and real lead time. It sorts work by value, risk, and delivery ability. The result is captured as Throughput Data, Flow Forecast, and Slicing Rules.Helps clarify observations, needs, and patterns in concrete terms. It groups observations into patterns, questions, and decisions. The result is captured as a HEART-GSM table and dashboard.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput.
Complexitysame
MediumMediumMediumMedium
Timedifferent
laufend120 min initial, dann laufendOngoing1-3 h
Participantsdifferent
2-123-62-123-8
Formatsame
Workshop + asyncWorkshop + asyncWorkshop + asyncWorkshop + async
Outputdifferent
Throughput Data, Flow Forecast, Slicing RulesHEART-GSM Table, DashboardKanban board, WIP policies, Flow metricsBottleneck Map, Flow Metrics, Improvement Options, Follow-up Measures
Tagsno overlap
EstimationForecastingFlow
MetricsUX researchMeasurementSatisfaction
FlowVisual managementDelivery
FlowMeasurementConstraints
Add more methods