methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for NoEstimates.
Agile
NoEstimates
Paper illustration for Dot Estimation.
Facilitation
Dot Estimation
Paper illustration of Leverage Points with its method-specific working model.
Systems Thinking
Leverage Points
Paper illustration of the Force Field Analysis working structure.
Decision Making
Force Field Analysis
Purposedifferent
When estimating slows a team down more than it helps, it shifts the focus to flow, small slices, and real lead time. It sorts work by value, risk, and delivery ability. The result is captured as Throughput Data, Flow Forecast, and Slicing Rules.When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets.Leverage Points show exactly where interventions in a system produce a disproportionate effect. It draws relationships, patterns, and feedback loops. The result is captured as a leverage map and action strategy.In change initiatives, supporting and restraining forces sit at the table at the same time. Force Field Analysis makes these tensions explicit and shows where change can be pushed forward by strengthening or relieving.
Complexitydifferent
MediumLowHighLow
Timedifferent
laufend5-20 minHalf day45-90 min
Participantsdifferent
2-123-203-123-12
Formatdifferent
Workshop + asyncWorkshopWorkshopWorkshop
Outputdifferent
Throughput Data, Flow Forecast, Slicing RulesEffort Heatmap, Risk Signals, Discussion TargetsLeverage Map, Action StrategyForce Field Map, Change Levers, Risk Notes
Tagsno overlap
EstimationForecastingFlow
EstimationEffortRisk
Systems thinkingChangeStrategy
ChangeDecisionStrategy
Add more methods