methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for NoEstimates.
Agile
NoEstimates
Paper illustration for Change Analysis.
Operations
Change Analysis
Paper illustration for Current Reality Tree
Systems Thinking
Current Reality Tree
Paper illustration for Bottleneck Analysis.
Operations
Bottleneck Analysis
Purposedifferent
When estimating slows a team down more than it helps, it shifts the focus to flow, small slices, and real lead time. It sorts work by value, risk, and delivery ability. The result is captured as Throughput Data, Flow Forecast, and Slicing Rules.For a deviation after a change, the method isolates the influence of the altered condition. It narrows down which differences are relevant and which are just accompanying noise.A Current Reality Tree condenses many symptoms into a few causal chains. The method makes visible which core problems drive several negative effects at once.For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput.
Complexitydifferent
MediumMediumHighMedium
Timedifferent
laufend45-120 min2-6 h1-3 h
Participantsdifferent
2-122-63-83-8
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop + async
Outputdifferent
Throughput Data, Flow Forecast, Slicing RulesChange Matrix, Cause Hypotheses, Validation Questions, Action ListCurrent Reality Tree, Core Problems, Intervention IdeasBottleneck Map, Flow Metrics, Improvement Options, Follow-up Measures
Tagsno overlap
EstimationForecastingFlow
ChangeRoot causeTroubleshootingComparison
Systems thinkingRoot causeConstraintsCausality
FlowMeasurementConstraints
Add more methods