methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for NoEstimates.
Agile
NoEstimates
Paper illustration for Change Analysis.
Operations
Change Analysis
Paper illustration for Bottleneck Analysis.
Operations
Bottleneck Analysis
Paper illustration for Current Reality Tree
Systems Thinking
Current Reality Tree
Purposedifferent
When estimating slows a team down more than it helps, it shifts the focus to flow, small slices, and real lead time. It sorts work by value, risk, and delivery ability. The result is captured as Throughput Data, Flow Forecast, and Slicing Rules.For a deviation after a change, the method isolates the influence of the altered condition. It narrows down which differences are relevant and which are just accompanying noise.For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput.A Current Reality Tree condenses many symptoms into a few causal chains. The method makes visible which core problems drive several negative effects at once.
Complexitydifferent
MediumMediumMediumHigh
Timedifferent
laufend45-120 min1-3 h2-6 h
Participantsdifferent
2-122-63-83-8
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshop + asyncWorkshop
Outputdifferent
Throughput Data, Flow Forecast, Slicing RulesChange Matrix, Cause Hypotheses, Validation Questions, Action ListBottleneck Map, Flow Metrics, Improvement Options, Follow-up MeasuresCurrent Reality Tree, Core Problems, Intervention Ideas
Tagsno overlap
EstimationForecastingFlow
ChangeRoot causeTroubleshootingComparison
FlowMeasurementConstraints
Systems thinkingRoot causeConstraintsCausality
Add more methods