View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Monte Carlo Forecasting.
Delivery
Monte Carlo Forecasting
Paper illustration for Three-Point Estimation.
Decision Making
Three-Point Estimation
Paper illustration for Theory of Constraints.
Operations
Theory of Constraints
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Purposedifferent
Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as Forecast Percentiles, Throughput Dataset, and Risk Communication.A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes.For a system that does not get faster despite effort, the method directs attention to the bottleneck. It concentrates improvement on the point that actually limits throughput.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.
Complexitydifferent
HighMediumHighMedium
Timedifferent
30-90 min Setup, danach laufend10-30 min je Item2-4 h Analyse, laufendOngoing
Participantsdifferent
1-81-83-122-12
Formatsame
Workshop + asyncWorkshop + asyncWorkshop + asyncWorkshop + async
Outputdifferent
Forecast Percentiles, Throughput Dataset, Risk CommunicationThree-Point Estimate, Risk Range, Assumption NotesConstraint Map, Improvement Plan, Flow MetricsKanban board, WIP policies, Flow metrics
Tagsno overlap
ForecastingFlowDelivery
EstimationUncertaintyForecasting
OperationsConstraintsFlowImprovement
FlowVisual managementDelivery
Add more methods