methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Monte Carlo Forecasting.
Delivery
Monte Carlo Forecasting
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration for Fault Tree Analysis.
Operations
Fault Tree Analysis
Paper illustration for Failure Mode and Effects Analysis
Operations
Failure Mode and Effects Analysis
Purposedifferent
Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as Forecast Percentiles, Throughput Dataset, and Risk Communication.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.For a critical top event with several possible triggers, the method logically models failure paths. It makes visible which combinations of conditions can lead to damage.For a process, product, or service with noticeable failure risks, the method assesses possible failure modes in advance. It directs attention to combinations of occurrence, effect, and detectability.
Complexitydifferent
HighMediumHighHigh
Timedifferent
30-90 min Setup, danach laufendOngoing2-6 h2-6 h
Participantsdifferent
1-82-123-83-10
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshop + asyncWorkshop
Outputdifferent
Forecast Percentiles, Throughput Dataset, Risk CommunicationKanban board, WIP policies, Flow metricsFault Tree, Critical Paths, Cause Hypotheses, Control ActionsFMEA Table, Risk Priority, Mitigation Actions
Tagsno overlap
ForecastingFlowDelivery
FlowVisual managementDelivery
RiskRoot causeSafety
RiskQualityOperationsRoot cause
Add more methods