methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of KPI Tree with its method-specific working model.
Product Strategy
KPI Tree
Paper illustration for Change Analysis.
Operations
Change Analysis
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
Paper illustration of Goal Question Metric with its method-specific working model.
Engineering
Goal Question Metric
Purposedifferent
When metrics across the organization drift apart, it arranges drivers and effects under one shared logic. It connects customer value, product logic, and decision priorities. The result is captured as a KPI tree and owner list.For a deviation after a change, the method isolates the influence of the altered condition. It narrows down which differences are relevant and which are just accompanying noise.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.Helps clarify technical problems, hypotheses, and next steps in concrete terms. It breaks a technical problem into testable parts. The result is captured as a GQM table and metric briefs.
Complexitydifferent
MediumMediumLowMedium
Timedifferent
90-180 min initial, dann laufend45-120 min15-30 min90-180 min
Participantsdifferent
3-82-62-63-6
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop
Outputdifferent
KPI Tree, Owner ListChange Matrix, Cause Hypotheses, Validation Questions, Action ListRoot cause notes, CountermeasuresGQM Table, Metric Profiles
Tagsno overlap
MetricsStrategyAlignmentMeasurement
ChangeRoot causeTroubleshootingComparison
Root causeIncidentLeanProblem solving
MetricsMeasurementEngineeringAlignment
Add more methods