methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Kepner-Tregoe
Operations
Kepner-Tregoe
Paper illustration for ABC Analysis
Operations
ABC Analysis
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration for 8D Problem Solving.
Operations
8D Problem Solving
Purposedifferent
For a disturbance that's hard to pin down, the method cleanly separates problem, cause, and decision. It reduces mixing when symptoms allow several interpretations.With many similar objects of differing economic significance, the method prioritizes effort by effect. It separates what needs regular steering from what rarely needs attention.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.For an acute quality or delivery problem, the method structures immediate protection and root cause work together. It keeps the situation stable while the actual cause is investigated cleanly.
Complexitydifferent
HighLowHighHigh
Timedifferent
2-8 h30-60 min90-180 min1-6 Wochen
Participantsdifferent
2-81-53-84-10
Formatdifferent
Workshop + asyncAsyncWorkshopWorkshop + async
Outputdifferent
Problem Analysis, Decision Analysis, Risk PlanABC Classification, Focus Rules, Control ListCoD Table, Prioritization Sequence8D Report, Containment Plan, Root Cause Evidence, Corrective Action Plan
Tagsno overlap
Problem solvingRoot causeDecisionOperations
PrioritizationOperationsPortfolio
PrioritizationDeliveryEconomicsDecision
QualityProblem solvingRoot cause
Add more methods