methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration for Waste Analysis.
Operations
Waste Analysis
Paper illustration for Bottleneck Analysis.
Operations
Bottleneck Analysis
Paper illustration for Theory of Constraints.
Operations
Theory of Constraints
Purposedifferent
When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.For a process that keeps people busy but creates little value, the method exposes waste. It directs attention to unnecessary movement, waiting times, rework, and overdelivery.For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput.For a system that does not get faster despite effort, the method directs attention to the bottleneck. It concentrates improvement on the point that actually limits throughput.
Complexitydifferent
MediumLowMediumHigh
Timedifferent
Ongoing45-120 min1-3 h2-4 h Analyse, laufend
Participantsdifferent
2-122-83-83-12
Formatdifferent
Workshop + asyncWorkshopWorkshop + asyncWorkshop + async
Outputdifferent
Kanban board, WIP policies, Flow metricsWaste Map, Prioritized Waste, Improvement BacklogBottleneck Map, Flow Metrics, Improvement Options, Follow-up MeasuresConstraint Map, Improvement Plan, Flow Metrics
Tagsno overlap
FlowVisual managementDelivery
WasteLeanProcess improvement
FlowMeasurementConstraints
OperationsConstraintsFlowImprovement
Add more methods