methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration for Three-Point Estimation.
Decision Making
Three-Point Estimation
Paper illustration for Dot Estimation.
Facilitation
Dot Estimation
Paper illustration for NoEstimates.
Agile
NoEstimates
Purposedifferent
When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes.When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets.When estimating slows a team down more than it helps, it shifts the focus to flow, small slices, and real lead time. It sorts work by value, risk, and delivery ability. The result is captured as Throughput Data, Flow Forecast, and Slicing Rules.
Complexitydifferent
MediumMediumLowMedium
Timedifferent
Ongoing10-30 min je Item5-20 minlaufend
Participantsdifferent
2-121-83-202-12
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop + async
Outputdifferent
Kanban board, WIP policies, Flow metricsThree-Point Estimate, Risk Range, Assumption NotesEffort Heatmap, Risk Signals, Discussion TargetsThroughput Data, Flow Forecast, Slicing Rules
Tagsno overlap
FlowVisual managementDelivery
EstimationUncertaintyForecasting
EstimationEffortRisk
EstimationForecastingFlow
Add more methods