Criterion
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Story Splitting method illustration showing its working structure
Agile
Story Splitting
Paper illustration for Theory of Constraints.
Operations
Theory of Constraints
Paper illustration for Bottleneck Analysis.
Operations
Bottleneck Analysis
Purposedifferent
When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.When a story becomes too large for a clean flow, it breaks scope down along value and risk. It shapes the work into a form that ships earlier and is easier to verify.For a system that does not get faster despite effort, the method directs attention to the bottleneck. It concentrates improvement on the point that actually limits throughput.For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput.
Complexitydifferent
MediumMediumHighMedium
Timedifferent
Ongoing30-60 min2-4 h Analyse, laufend1-3 h
Participantsdifferent
2-122-63-123-8
Formatsame
Workshop + asyncWorkshop + asyncWorkshop + asyncWorkshop + async
Outputdifferent
Kanban board, WIP policies, Flow metricsSmaller Stories, Acceptance Criteria, Split RationaleConstraint Map, Improvement Plan, Flow MetricsBottleneck Map, Flow Metrics, Improvement Options, Follow-up Measures
Tagsno overlap
FlowVisual managementDelivery
BacklogIterationDelivery
OperationsConstraintsFlowImprovement
FlowMeasurementConstraints