View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Engineering Kanban | ![]() Architecture Software Architecture Canvas | ![]() Facilitation Power Interest Grid | ![]() Facilitation Alignment Mapping |
|---|---|---|---|---|
Purposedifferent | When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable. | The Software Architecture Canvas reduces a system to the most important architecture decisions, constraints, and interfaces. It is useful when teams need a resilient overall picture quickly. | When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy. | When several people work toward one goal but hold different mental maps, Alignment Mapping makes the discrepancies visible. It arranges goals, assumptions, and priorities so shared direction becomes verifiable. |
Complexitydifferent | Medium | Low | Low | Medium |
Timedifferent | Ongoing | 1-2 h | 30-60 min | 1-2 h |
Participantsdifferent | 2-12 | 3-10 | 2-8 | 4-12 |
Formatdifferent | Workshop + async | Workshop | Workshop | Workshop |
Outputdifferent | Kanban board, WIP policies, Flow metrics | Architecture Canvas, Goals, Constraints, Quality Attributes | Power Interest Grid, Strategy per Stakeholder | Alignment Map, Open Issues, Decision Questions |
Tagsno overlap | FlowVisual managementDelivery | CanvasArchitectureAlignmentWorkshop | StakeholdersFacilitationAlignmentPlanning | AlignmentStakeholdersStrategyFacilitation |



