methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration for Monte Carlo Forecasting.
Delivery
Monte Carlo Forecasting
Paper illustration of Leverage Points with its method-specific working model.
Systems Thinking
Leverage Points
Paper illustration of the Force Field Analysis working structure.
Decision Making
Force Field Analysis
Purposedifferent
When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as Forecast Percentiles, Throughput Dataset, and Risk Communication.Leverage Points show exactly where interventions in a system produce a disproportionate effect. It draws relationships, patterns, and feedback loops. The result is captured as a leverage map and action strategy.In change initiatives, supporting and restraining forces sit at the table at the same time. Force Field Analysis makes these tensions explicit and shows where change can be pushed forward by strengthening or relieving.
Complexitydifferent
MediumHighHighLow
Timedifferent
Ongoing30-90 min Setup, danach laufendHalf day45-90 min
Participantsdifferent
2-121-83-123-12
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop
Outputdifferent
Kanban board, WIP policies, Flow metricsForecast Percentiles, Throughput Dataset, Risk CommunicationLeverage Map, Action StrategyForce Field Map, Change Levers, Risk Notes
Tagsno overlap
FlowVisual managementDelivery
ForecastingFlowDelivery
Systems thinkingChangeStrategy
ChangeDecisionStrategy
Add more methods