View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration for Monte Carlo Forecasting.
Delivery
Monte Carlo Forecasting
Paper illustration for Kepner-Tregoe
Operations
Kepner-Tregoe
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Purposedifferent
When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as Forecast Percentiles, Throughput Dataset, and Risk Communication.For a disturbance that's hard to pin down, the method cleanly separates problem, cause, and decision. It reduces mixing when symptoms allow several interpretations.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.
Complexitydifferent
MediumHighHighHigh
Timedifferent
Ongoing30-90 min Setup, danach laufend2-8 h90-180 min
Participantsdifferent
2-121-82-83-8
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshop + asyncWorkshop
Outputdifferent
Kanban board, WIP policies, Flow metricsForecast Percentiles, Throughput Dataset, Risk CommunicationProblem Analysis, Decision Analysis, Risk PlanCoD Table, Prioritization Sequence
Tagsno overlap
FlowVisual managementDelivery
ForecastingFlowDelivery
Problem solvingRoot causeDecisionOperations
PrioritizationDeliveryEconomicsDecision
Add more methods