methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration of a branching impact map with a Why goal at the root, actor circles, How behavior changes and What options.
Product Strategy
Impact Mapping
Paper illustration for Constraint Analysis.
Decision Making
Constraint Analysis
Paper illustration for Bottleneck Analysis.
Operations
Bottleneck Analysis
Purposedifferent
When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.When a goal needs to be connected to several possible paths, it shows chains of impact instead of feature lists. It connects business goal, behavior change, and measures.When an initiative stalls, the limit often lies not in the idea but in hard or soft boundary conditions. Constraint Analysis separates these limits and shows which of them can actually be shaped.For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput.
Complexitydifferent
MediumMediumLowMedium
Timedifferent
Ongoing45-90 min30-90 min1-3 h
Participantsdifferent
2-123-82-83-8
Formatdifferent
Workshop + asyncWorkshopWorkshop + asyncWorkshop + async
Outputdifferent
Kanban board, WIP policies, Flow metricsImpact Map, Outcome Hypotheses, Delivery OptionsConstraint List, Hard/Soft Classification, Option Impact Notes, Decision BoundariesBottleneck Map, Flow Metrics, Improvement Options, Follow-up Measures
Tagsno overlap
FlowVisual managementDelivery
OutcomesStrategyBehaviorPlanning
ConstraintsDecisionPlanningOptions
FlowMeasurementConstraints
Add more methods