methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration for Constraint Analysis.
Decision Making
Constraint Analysis
Paper illustration of the Lightning Decision Jam working structure.
Facilitation
Decision Jam
Paper illustration for Bottleneck Analysis.
Operations
Bottleneck Analysis
Purposedifferent
When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.When an initiative stalls, the limit often lies not in the idea but in hard or soft boundary conditions. Constraint Analysis separates these limits and shows which of them can actually be shaped.When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer.For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput.
Complexitydifferent
MediumLowLowMedium
Timedifferent
Ongoing30-90 min60-90 min1-3 h
Participantsdifferent
2-122-84-103-8
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop + async
Outputdifferent
Kanban board, WIP policies, Flow metricsConstraint List, Hard/Soft Classification, Option Impact Notes, Decision BoundariesProblem Cluster, Prioritized Challenge, ExperimentBottleneck Map, Flow Metrics, Improvement Options, Follow-up Measures
Tagsno overlap
FlowVisual managementDelivery
ConstraintsDecisionPlanningOptions
FacilitationDecisionProblem solvingWorkshop
FlowMeasurementConstraints
Add more methods