methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration for Bottleneck Analysis.
Operations
Bottleneck Analysis
Paper illustration for Affinity Estimation.
Agile
Affinity Estimation
Paper illustration for Planning Poker.
Agile
Planning Poker
Purposedifferent
When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput.When many tasks need to be classified quickly, it sorts them by perceived effort and similarity. It reduces the effort of fine-grained estimation for large volumes.When estimates within the team diverge too much, it puts differing expectations on a common test bench. It separates rough complexity from unspoken assumptions.
Complexitydifferent
MediumMediumMediumLow
Timedifferent
Ongoing1-3 h30-90 min2-5 min je Item
Participantsdifferent
2-123-83-123-9
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop + async
Outputdifferent
Kanban board, WIP policies, Flow metricsBottleneck Map, Flow Metrics, Improvement Options, Follow-up MeasuresAffinity Size Map, Grouped Estimates, Unclear ItemsRelative Estimates, Assumption Notes, Split Candidates
Tagsno overlap
FlowVisual managementDelivery
FlowMeasurementConstraints
EstimationBacklogRelative sizing
EstimationAgileRelative sizingTeam
Add more methods