methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration for Bottleneck Analysis.
Operations
Bottleneck Analysis
A3 Problem-Solving workspace showing the question, observations, and next decision.
Operations
A3 Problem Solving
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
Purposedifferent
When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput.For a complex deviation with several people involved, the method bundles problem, analysis, and decision onto one page. It creates a shared working space where causes, countermeasures, and follow-up fit together.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.
Complexitydifferent
MediumMediumMediumLow
Timedifferent
Ongoing1-3 h45-90 min15-30 min
Participantsdifferent
2-123-82-52-6
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshop + asyncWorkshop
Outputdifferent
Kanban board, WIP policies, Flow metricsBottleneck Map, Flow Metrics, Improvement Options, Follow-up MeasuresA3 Report, Action Plan, Root Cause AnalysisRoot cause notes, Countermeasures
Tagsno overlap
FlowVisual managementDelivery
FlowMeasurementConstraints
LeanProblem solvingCoachingOperations
Root causeIncidentLeanProblem solving
Add more methods