View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Kaizen Event | ![]() Operations Standard Work Analysis | ![]() Operations DMAIC | ![]() Operations Fishbone Diagram |
|---|---|---|---|---|
Purposedifferent | For a tightly scoped process segment with noticeable waste, the method bundles shared energy for change. It suits situations that call for fast learning loops and visible adjustments. | When the same task is done differently depending on the person, the method exposes the reliable core. It creates comparability without unnecessarily choking off needed latitude. | For a process problem with fluctuating performance, the method brings analysis and improvement into a disciplined sequence. It creates a framework in which numbers, causes, and control come together. | When a problem has several possible contributing factors, the method sorts causes by cause areas. It prevents an initial hunch from blocking the view of other plausible drivers. |
Complexitydifferent | Medium | Medium | High | Low |
Timedifferent | 0.5-5 Tage | 1-3 h | 2-12 Wochen | 30-60 min |
Participantsdifferent | 4-10 | 2-6 | 3-10 | 2-8 |
Formatdifferent | Workshop | Workshop | Workshop + async | Workshop |
Outputdifferent | Kaizen Charter, Waste List, Improvement Experiments, Standard Work Update | Standard Work Sheet, Deviation List, Improved Standard, Training Needs | Project Charter, Measurement Plan, Cause Analysis, Control Plan | Fishbone Diagram, Cause Categories, Investigation Backlog |
Tagsno overlap | LeanContinuous improvementOperations | LeanProcessQuality | Continuous improvementQualityProcess improvement | Root causeQualityOperations |



