View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Systems Thinking Intervention Mapping | ![]() Decision Making PERT Estimation | ![]() Systems Thinking Future Reality Tree | ![]() Facilitation Dot Estimation |
|---|---|---|---|---|
Purposedifferent | Intervention Mapping translates a need for change into a planned, evaluable program. The method connects target group, determinants, actions, and measurement into a traceable chain. | On complex initiatives, a plain average tends to understate just how uncertain the outcome really is. It separates options, evaluation criteria, and open risks. The result is captured as a PERT Estimate, Expected Value, and Risk Notes. | A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation. | When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets. |
Complexitydifferent | High | Medium | High | Low |
Timedifferent | 1-5 Tage | 15-45 min | 2-4 h | 5-20 min |
Participantsdifferent | 4-12 | 1-8 | 3-8 | 3-20 |
Formatdifferent | Workshop + async | Workshop + async | Workshop | Workshop |
Outputdifferent | Logic Model, Change Objectives, Intervention Components, Evaluation Plan | PERT Estimate, Expected Value, Risk Notes | Future Reality Tree, Negative Branches, Assumption List, Improved Injections | Effort Heatmap, Risk Signals, Discussion Targets |
Tagsno overlap | ChangeSystems thinkingCapability | EstimationUncertaintyRisk | Theory of ConstraintsSystems thinkingChange | EstimationEffortRisk |



