View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Systems Thinking Intervention Mapping | ![]() Facilitation Dot Estimation | ![]() Agile Planning Poker | ![]() Systems Thinking Future Reality Tree |
|---|---|---|---|---|
Purposedifferent | Intervention Mapping translates a need for change into a planned, evaluable program. The method connects target group, determinants, actions, and measurement into a traceable chain. | When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets. | When estimates within the team diverge too much, it puts differing expectations on a common test bench. It separates rough complexity from unspoken assumptions. | A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation. |
Complexitydifferent | High | Low | Low | High |
Timedifferent | 1-5 Tage | 5-20 min | 2-5 min je Item | 2-4 h |
Participantsdifferent | 4-12 | 3-20 | 3-9 | 3-8 |
Formatdifferent | Workshop + async | Workshop | Workshop + async | Workshop |
Outputdifferent | Logic Model, Change Objectives, Intervention Components, Evaluation Plan | Effort Heatmap, Risk Signals, Discussion Targets | Relative Estimates, Assumption Notes, Split Candidates | Future Reality Tree, Negative Branches, Assumption List, Improved Injections |
Tagsno overlap | ChangeSystems thinkingCapability | EstimationEffortRisk | EstimationAgileRelative sizingTeam | Theory of ConstraintsSystems thinkingChange |