methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Game Day workspace showing the question, observations, and next decision.
DevOps
Game Day
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Paper illustration for 8D Problem Solving.
Operations
8D Problem Solving
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
Purposedifferent
In preparing for rare incidents, the method tests response capability under controlled conditions. It shows where assumptions about stability, roles, and recovery are too optimistic.In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.For an acute quality or delivery problem, the method structures immediate protection and root cause work together. It keeps the situation stable while the actual cause is investigated cleanly.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.
Complexitydifferent
HighLowHighLow
Timedifferent
Halber Tag20–45 min1-6 Wochen15-30 min
Participantsdifferent
5-20Small cross-functional group4-102-6
Formatdifferent
WorkshopWorkshopWorkshop + asyncWorkshop
Outputdifferent
Simulation Notes, Gaps List, Updated RunbooksRisk list, Mitigation plan, Assumption log8D Report, Containment Plan, Root Cause Evidence, Corrective Action PlanRoot cause notes, Countermeasures
Tagsno overlap
ResilienceOperationsIncident
RiskDecisionFailurePlanning
QualityProblem solvingRoot cause
Root causeIncidentLeanProblem solving
Add more methods