View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() DevOps Game Day | ![]() Engineering Failure Scenario Analysis | ![]() Operations Getting Things Done | ![]() Decision Making Pre-Mortem |
|---|---|---|---|---|
Purposedifferent | In preparing for rare incidents, the method tests response capability under controlled conditions. It shows where assumptions about stability, roles, and recovery are too optimistic. | In critical processes, it is not enough to plan only for the normal case. Failure Scenario Analysis looks at the path into failure and shows which failures, chains, and control gaps cause the most damage. | With many open commitments and ideas in daily life, a reliable external storage system emerges. The method relieves the mind so priority and context don't have to compete in memory. | In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures. |
Complexitydifferent | High | Medium | Medium | Low |
Timedifferent | Halber Tag | 1-3 h | 1-2 h Setup, laufend | 20–45 min |
Participantsdifferent | 5-20 | 3-8 | 1 | Small cross-functional group |
Formatdifferent | Workshop | Workshop | Async | Workshop |
Outputdifferent | Simulation Notes, Gaps List, Updated Runbooks | Failure Scenarios, Risk Notes, Control Gaps, Test and Response Actions | Action Lists, Project List, Review Routine | Risk list, Mitigation plan, Assumption log |
Tagsno overlap | ResilienceOperationsIncident | FailureResilienceRisk | ProductivityPlanningTasksExecution | RiskDecisionFailurePlanning |



