methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Game Day workspace showing the question, observations, and next decision.
DevOps
Game Day
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
Paper illustration for 8D Problem Solving.
Operations
8D Problem Solving
Paper illustration for Failure Mode and Effects Analysis
Operations
Failure Mode and Effects Analysis
Purposedifferent
In preparing for rare incidents, the method tests response capability under controlled conditions. It shows where assumptions about stability, roles, and recovery are too optimistic.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.For an acute quality or delivery problem, the method structures immediate protection and root cause work together. It keeps the situation stable while the actual cause is investigated cleanly.For a process, product, or service with noticeable failure risks, the method assesses possible failure modes in advance. It directs attention to combinations of occurrence, effect, and detectability.
Complexitydifferent
HighLowHighHigh
Timedifferent
Halber Tag15-30 min1-6 Wochen2-6 h
Participantsdifferent
5-202-64-103-10
Formatdifferent
WorkshopWorkshopWorkshop + asyncWorkshop
Outputdifferent
Simulation Notes, Gaps List, Updated RunbooksRoot cause notes, Countermeasures8D Report, Containment Plan, Root Cause Evidence, Corrective Action PlanFMEA Table, Risk Priority, Mitigation Actions
Tagsno overlap
ResilienceOperationsIncident
Root causeIncidentLeanProblem solving
QualityProblem solvingRoot cause
RiskQualityOperationsRoot cause
Add more methods