methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of Futures Wheel with its method-specific working model.
Systems Thinking
Futures Wheel
A paper-based illustration representing WSJF with its core stages and visible working result.
Agile
WSJF
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Purposedifferent
The Futures Wheel helps explore the consequences of a decision, a trend, or a strategic move in a structured way. It makes visible which first, second, and third-order effects could arise from an event.When many tasks compete for the same capacity, it orders work by economic impact. It makes time lost, benefit, and effort comparable together.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.
Complexitydifferent
MediumHighMediumHigh
Timedifferent
60-120 min45-90 minOngoing90-180 min
Participantsdifferent
3-103-102-123-8
Formatdifferent
Workshop + asyncWorkshopWorkshop + asyncWorkshop
Outputdifferent
Futures Wheel, Consequence Chains, Strategic SignalsRanked Backlog, Cost-of-Delay AssumptionsKanban board, WIP policies, Flow metricsCoD Table, Prioritization Sequence
Tagsno overlap
ForesightSystems thinkingSignals
LeanEconomicsSequencePrioritization
FlowVisual managementDelivery
PrioritizationDeliveryEconomicsDecision
Add more methods