View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Failure Mode and Effects Analysis | ![]() Operations Fishbone Diagram | ![]() Operations ALPEN Method | ![]() Operations Getting Things Done |
|---|---|---|---|---|
Purposedifferent | For a process, product, or service with noticeable failure risks, the method assesses possible failure modes in advance. It directs attention to combinations of occurrence, effect, and detectability. | When a problem has several possible contributing factors, the method sorts causes by cause areas. It prevents an initial hunch from blocking the view of other plausible drivers. | With an overloaded day full of too many tasks, a realistic picture of the day emerges. The method connects estimating, deciding, and buffer thinking so planning fits available energy and time. | With many open commitments and ideas in daily life, a reliable external storage system emerges. The method relieves the mind so priority and context don't have to compete in memory. |
Complexitydifferent | High | Low | Low | Medium |
Timedifferent | 2-6 h | 30-60 min | 10-20 min daily | 1-2 h Setup, laufend |
Participantsdifferent | 3-10 | 2-8 | 1 | 1 |
Formatdifferent | Workshop | Workshop | Async | Async |
Outputdifferent | FMEA Table, Risk Priority, Mitigation Actions | Fishbone Diagram, Cause Categories, Investigation Backlog | Daily Plan, Time Estimates, Review Notes | Action Lists, Project List, Review Routine |
Tagsno overlap | RiskQualityOperationsRoot cause | Root causeQualityOperations | PlanningTime managementProductivityOperations | ProductivityPlanningTasksExecution |



