View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Business Strategy 5-Minuten VC-Check | ![]() Product Discovery Assumption Mapping | ![]() Innovation SCAMPER | ![]() Innovation Lotus Blossom |
|---|---|---|---|---|
Purposedifferent | The 5-Minute VC Check clarifies opportunities and strategic options at the earliest idea stage. It compares problem quality, customer willingness to pay, alternatives, differentiation, and market potential, and captures the result as a VC-check note, go/sharpen/park decision, and risk list. | When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first. | For an existing solution under pressure to change, the method deliberately opens space for systematic variants. It directs attention to rebuilding, combining, and repurposing rather than only new basic ideas. This produces concrete evolution paths for products, offerings, or workflows. | When a central question feels too large, the method breaks it into neighboring topic fields with their own depth of ideation. It holds structure and openness at the same time, so adjacent perspectives don't get lost. This grows an idea space out of a core problem. |
Complexitydifferent | Low | Medium | Low | Low |
Timedifferent | 5-15 min | 45-60 min | 30-60 min | 45-90 min |
Participantsdifferent | 1-5 | 2-8 | 2-10 | 3-10 |
Formatdifferent | Workshop + async | Workshop + async | Workshop | Workshop |
Outputdifferent | VC-check note, Go/sharpen/park decision, Risk and assumption list, Next validation step | Assumption map, Test backlog, Risk ranking | SCAMPER Idea List, Concept Shortlist, Variation Notes | Lotus Diagram, Idea Themes, Shortlist |
Tagsno overlap | StartupValidationCompetition | AssumptionsRiskExperimentsValidation | BrainstormingIdeationCreativityReframingInnovation | BrainstormingIdeationCreativityDivergenceWorkshop |



