Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Fault Tree Analysis.
Operations
Fault Tree Analysis
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration for NoEstimates.
Agile
NoEstimates
Paper illustration for Dot Estimation.
Facilitation
Dot Estimation
Purposedifferent
For a critical top event with several possible triggers, the method logically models failure paths. It makes visible which combinations of conditions can lead to damage.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.When estimating slows a team down more than it helps, it shifts the focus to flow, small slices, and real lead time. It sorts work by value, risk, and delivery ability. The result is captured as Throughput Data, Flow Forecast, and Slicing Rules.When size or effort can only be estimated roughly, Dot Estimation condenses the group's experience into a quick range. It turns individual contributions into a visible selection. The result is captured as an Effort Heatmap, Risk Signals, and Discussion Targets.
Complexitydifferent
HighMediumMediumLow
Timedifferent
2-6 hOngoinglaufend5-20 min
Participantsdifferent
3-82-122-123-20
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshop + asyncWorkshop
Outputdifferent
Fault Tree, Critical Paths, Cause Hypotheses, Control ActionsKanban board, WIP policies, Flow metricsThroughput Data, Flow Forecast, Slicing RulesEffort Heatmap, Risk Signals, Discussion Targets
Tagsno overlap
RiskRoot causeSafety
FlowVisual managementDelivery
EstimationForecastingFlow
EstimationEffortRisk