methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Fault Isolation.
Engineering
Fault Isolation
Paper illustration for Time Blocking
Operations
Time Blocking
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
Paper illustration for 8D Problem Solving.
Operations
8D Problem Solving
Purposedifferent
In technical failures, the visible symptom often gets mixed up with the actual cause. Fault Isolation narrows the fault space and progressively reduces which part of the system is truly affected.With a calendar that grows on request, the method makes available time explicit again. It combines appointments, focus work, and buffer into a more realistic day structure.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.For an acute quality or delivery problem, the method structures immediate protection and root cause work together. It keeps the situation stable while the actual cause is investigated cleanly.
Complexitydifferent
MediumLowLowHigh
Timedifferent
30-180 min15-30 min Planung, laufend15-30 min1-6 Wochen
Participantsdifferent
1-612-64-10
Formatdifferent
Workshop + asyncAsyncWorkshopWorkshop + async
Outputdifferent
Fault Isolation Map, Test Log, Excluded Hypotheses, Narrowed Fault AreaBlocked Calendar, Capacity View, Focus PlanRoot cause notes, Countermeasures8D Report, Containment Plan, Root Cause Evidence, Corrective Action Plan
Tagsno overlap
TroubleshootingDiagnosisEngineering
PlanningTime managementFocus
Root causeIncidentLeanProblem solving
QualityProblem solvingRoot cause
Add more methods