View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Engineering Fault Isolation | ![]() Innovation Crazy 8s | ![]() Innovation Brainstorming | ![]() Innovation Lotus Blossom |
|---|---|---|---|---|
Purposedifferent | In technical failures, the visible symptom often gets mixed up with the actual cause. Fault Isolation narrows the fault space and progressively reduces which part of the system is truly affected. | With only a few minutes available and a still-fuzzy solution search, the method forces a wide range of variants. It produces fast sketches before the first idea can settle in, making different directions directly comparable and open to further development. | When a team faces an open question with many obvious directions, the method first creates breadth instead of premature commitment. It separates idea flow from evaluation and makes lines of thought visible, creating a pool for selection and further development. | When a central question feels too large, the method breaks it into neighboring topic fields with their own depth of ideation. It holds structure and openness at the same time, so adjacent perspectives don't get lost. This grows an idea space out of a core problem. |
Complexitydifferent | Medium | Low | Low | Low |
Timedifferent | 30-180 min | 8-15 min | 30-60 min | 45-90 min |
Participantsdifferent | 1-6 | 1-10 | 4-12 | 3-10 |
Formatdifferent | Workshop + async | Workshop | Workshop | Workshop |
Outputdifferent | Fault Isolation Map, Test Log, Excluded Hypotheses, Narrowed Fault Area | Sketch Set, Idea Shortlist, Direction Options | Idea pool, Theme clusters, Shortlist | Lotus Diagram, Idea Themes, Shortlist |
Tagsno overlap | TroubleshootingDiagnosisEngineering | BrainstormingSketchingSpeedDivergenceDesign sprint | BrainstormingIdeationCreativityWorkshopDivergence | BrainstormingIdeationCreativityDivergenceWorkshop |



