View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Engineering Failure Scenario Analysis | ![]() Operations Waste Analysis | ![]() Decision Making Pre-Mortem | ![]() Decision Making Constraint Analysis |
|---|---|---|---|---|
Purposedifferent | In critical processes, it is not enough to plan only for the normal case. Failure Scenario Analysis looks at the path into failure and shows which failures, chains, and control gaps cause the most damage. | For a process that keeps people busy but creates little value, the method exposes waste. It directs attention to unnecessary movement, waiting times, rework, and overdelivery. | In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures. | When an initiative stalls, the limit often lies not in the idea but in hard or soft boundary conditions. Constraint Analysis separates these limits and shows which of them can actually be shaped. |
Complexitydifferent | Medium | Low | Low | Low |
Timedifferent | 1-3 h | 45-120 min | 20–45 min | 30-90 min |
Participantsdifferent | 3-8 | 2-8 | Small cross-functional group | 2-8 |
Formatdifferent | Workshop | Workshop | Workshop | Workshop + async |
Outputdifferent | Failure Scenarios, Risk Notes, Control Gaps, Test and Response Actions | Waste Map, Prioritized Waste, Improvement Backlog | Risk list, Mitigation plan, Assumption log | Constraint List, Hard/Soft Classification, Option Impact Notes, Decision Boundaries |
Tagsno overlap | FailureResilienceRisk | WasteLeanProcess improvement | RiskDecisionFailurePlanning | ConstraintsDecisionPlanningOptions |



